Alliant Energy Iowa, Iowa

Alliant Energy individual customer rate for QTS data center

Approved Rate matter, docket TF-2025-0047 before the Iowa Utilities Commission.

No residential dollar figure published yet

The filing does not state a typical-bill impact we can verify. We will add one when the commission staff or the consumer advocate publishes it.

Fileddate not published
Hearingheld or waived
Decisiondecided
On billsdate not published

Alliant Energy's Iowa utility also won Iowa Utilities Commission approval for an individual customer rate contract with QTS for its hyperscale data center campus at the Big Cedar Industrial Center in Cedar Rapids. Like the Vulpine Power contract for Google's site next door, it locks QTS into a long term minimum payment regardless of how much power it actually uses. Through April 2026 these were the only two such large load contracts Alliant had brought to Iowa regulators.

What it means for your bill: This is a private contract rate for a data center developer, not a residential rate, built to keep large new loads from raising costs for everyone else.

Status
Approved
Utility
Alliant Energy Iowa
Commission
Iowa Utilities Commission
Docket
TF-2025-0047
Data center linked
Yes. The filing ties part of the cost or the tariff design to data center load.
Last checked
August 29, 2026

Sources

Get an email when this changes